The urban regeneration project covers a land area of approximately 52,000 sqm, with green spaces and parking areas already transferred to the Municipal Administration.
The covered surface of the planned buildings ranges from approximately 12,000 sqm to 20,000 sqm (GFA of 30,000 sqm with a mezzanine), with a height of about 10-12 meters. However, the Municipal Administration is open to accommodating urban planning needs, with a preference for hosting high-tech activities by the end user.
It is a production-designated area, well served by the electrification system and located along the Brembo River, which offers potential for water exploitation.
The development has not yet been built. Therefore, it can still be customized to perfectly match the final user's productivity requirements.
These customizations will help define the site plan layout, building heights, and overall volumetric arrangement.
Private
52.000 m²
Management/Offices, Industrial, Commercial/Retail
Final users, Investors
New Project
Location, Sales
The total value of the project, including the cost of the land and the construction costs of the requested development, is approximately 20 to 22 million euros, depending on specific construction details (heights, capacities, loads, etc.).
35 %
12 m
All main connections are available, including water, electricity, gas, and fiber optics.
Some of the facilities from the previously established activity have been dismantled on the site, carrying out preparation and setup work for the subsequent reuse of the area.
There are no easements.