Skip to content. | Skip to navigation

Opportunity

Former Zanardi barracks - lot 3-4

Via Kennedy snc - 27058 - Voghera (PV)
Property

Public

Total GFA

4.600 m²

Reference sector

Offices

Are you interested in this settlement opportunity?

Information request

Discover more about the province of Pavia

Discover more

Details

Descrizione

Ideal for offices and hospitality-tourism activities. Adjacent to the historic centre and equipped with ample parking areas. The property consists of two storeys: the ground level is current subdivided into 2 large rooms, currently unusable and about ten smaller partially usable rooms; the upper storey is currently subdivided into about thirty rooms with minimum dimensions of 25 m2 and maximum of 60 m2. For concession, a public call for bids will be used

Property

Public

Anno di costruzione

1864

Total GFA

4.600 m²

Buildable area

8.700 m²

Area and building dimensions

Usable 7,000 m2 of floor space to be designated for managerial, commercial and tourism-hospitality activities. Height 12 mt

Reference sector

Offices

Urban planning restrictions

Building subject to direct historic-artistic obligation under art. 10 L.D. 42/2004. Only operations for restoration and conservation remediation are possible

Remediation

Not necessary

Investment opportunity

Investment type

Concession

Price range for rent (€/m²)

2,20

Competitive advantages

Strategic location
Building adjacent to the city centre

Accessibility to infrastructure and services
Near to the main infrastructure networks: Via Emilia; presence of free parking in the courtyard in the area

Highly desirable context
Famous building, of high historic and architectural value, that contains municipal public offices and museums, in addition to the Civica Ricottiana Library

Most favoured sectors

Favoured both direct and indirect designations. Direct designations, meaning those that can be established: managerial sectors (ATECO code 70 business management and management consulting activities) and tourism-hospitality (ATECO code 55 Lodging and food services activities). Advantages: tax breaks, computer related, infrastructure. Indirect designations based on satellite industries created: 56 food services activities and 47 retail trade

Investments not permitted

Large sales facilities, all productive manufacturing activities and service station are excluded by the PGT

Accessibility

Exit
A21 - Voghera

5 km

Exit
A7 - Casei Gerola

7 km

Ex Strada Statale 10

2 km

tangenziale Voghera-Casteggio

3 km

Railway Station
Stazione Ferroviaria FS di Voghera (PV)

2 km

Airport
Aeroporto di Linate (MI)

76 km

Airport
Aeroporto turistico di Rivanazzano (PV)

4 km

Other
22 km - Freight centre of Rivalta Scrivia - Tortona (AL)
93 km - Port of Genoa

Commitments and incentives by the Municipality

Semplification commitments

  • Guarantees that the Action Plan presented by the company is adopted by the City Council in less than 90 days from the date the request was registered.
  • Releases, upon a complete request being made, a Planning Permission in less than 60 days from the request.
  • Ensures an online 'front office' service or a dedicated section in the municipality's portal where investors or potential investors can find all useful information.
  • Uses and implements the 'electronic desk'.
  • Uses the SUAP [single contact point for productive activity] for proper additions to the Electronic Company File.
  • Guarantees a training course for the SUAP operators.
  • Participates in training programs related to the Electronic Company File.

Economic and fiscal incentives

  • Declares in advance all the urban planning and construction making sur not to introduce additional expenses.
  • Provides for an IMU [municipal property tax] + TASI [municipal tax on community services] tax rate of 10.6‰ in the areas identified.
  • Reduces the TARI [waste disposal tax] by at least 20% from the current amount.
  • Provides reimbursement of IMU and TASI debits and credits.

Qualified assistance to the investor

  • Provides preliminary consulting services and support to companies in the presentation and implementation of their projects, with the issuance of written opinions if requested in the proposal.
  • Holds regular meetings to solve any problems with the investment process and to provide support regarding methods for payment of local taxes.

Download area


Floor plan

If you have any questions, do not hesitate to contact us

Contact us