Skip to content. | Skip to navigation

Opportunity sold

Via Madrid area, corner of Via Berlino

Via Madrid/Via Berlino - 24040 - Verdellino (BG)
Property

Public

Total GIA

11.400 m²

Reference sector

Industriale/artigianale

Are you interested in this settlement opportunity?

Information request

Discover more about the province of Bergamo

Discover more

Details

Property

Public

Total GIA

11.400 m²

Total GFA

11.900 m²

Buildable area

11.400 m²

Area and building dimensions

11,900 m2 productive

Reference sector

Industriale/artigianale

Urban planning restrictions

No obligations

Remediation

Not necessary

Investment opportunity

Investment type

Sales

Price range for sales (€/m²)

Private negotiation

Competitive advantages

Accessibility to infrastructure and services
Area close to the main infrastructure networks and located in the production part of Zingonia from the current PGT

Accessibility to infrastructure and services
Area equipped with all the main services: energy, water and telecommunications

Accessibility to infrastructure and services
Presence of digital infrastructure for high-speed connectivity using fibre optic

Most favoured sectors

Manufacturing and industrial/artisan activities in the secondary sector

Investments not permitted

All uses in the primary Ua and Ub sector, among the uses of the secondary sector: Ucd, Ucf, Ucg, Uc, all uses in the Ue large-scale distribution commercial sector, all connected residential Uf uses, except as permitted under point 18.9, among the Ug uses for business, artisan and brokering related to residences: Uga2 (except for activities unrelated to the food sector, among the Uh uses for hospitality activities: Uhb, of the activities unrelated to the food sector, among the Uh uses for hospitality activities: Uhb, Uhc, Uib3 uses, among the Um uses for health and sanitation: Uma1, Uma2, Uma4, among the uses of the secondary sector: Ucb (except for Ucb1, Ucb4 and Ucb5 uses), all Uq uses for services to vehicular transportation, all Ur uses for general and primary urbanisation systems except for Ur5 uses

Accessibility

Exit
A4 - Capriate (BG)

7 km

Strada Statale 42 della Mendola e del Tonale

< 1 km

Railway Station
Verdello‐Dalmine (BG)

2 km

Airport
Orio al Serio (BG) - BGY

15 km

Other
12.5 km Autostrada Bre.BE.MI. Caravaggio tollbooth

Commitments and incentives by the Municipality

Semplification commitments

  • Guarantees that the Action Plan presented by the company is adopted by the City Council in less than 90 days from the date the request was registered.
  • Releases, upon a complete request being made, a Planning Permission in less than 60 days from the request.
  • Ensures an online 'front office' service or a dedicated section in the municipality's portal where investors or potential investors can find all useful information.
  • Uses and implements the 'electronic desk'.
  • Uses the SUAP [single contact point for productive activity] for proper additions to the Electronic Company File.
  • Guarantees a training course for the SUAP operators.
  • Participates in training programs related to the Electronic Company File.

Economic and fiscal incentives

  • Declares in advance all the urban planning and construction expenses, making sure not to introduce additional expenses.
  • Provides for an IMU [municipal property tax] + TASI [municipal tax on community services] tax rate of 10.40‰ in the areas identified.
  • Provides reimbursement of IMU and TASI debits and credits.
  • Reduces the qualitative standard and any expenses needed to change designation of use by 50%.

Qualified assistance to the investor

  • Provides preliminary consulting services and support to companies in the presentation and implementation of their projects, with the issuance of written opinions if requested in the proposal.
  • Holds regular meetings to solve any problems with the investment process and to provide support regarding methods for payment of local taxes.

Download area


Floor plan

If you have any questions, do not hesitate to contact us

Contact us