Are you interested in this settlement opportunity?
Information requestDiscover more about the province of Cremona
Discover moreThe current built-up area amounts to 8,750 sqm, consisting of multiple building structures, some recent (3,515 sqm) and some older (4,635 sqm). Possibility of demolition for new construction requirements.
Private
25.239 m²
50.479 m²
Industrial/artisanal
Demolition and reconstruction
Not necessary
Disposal of asbestos-containing fiber cement (approximately 6,400 sqm) with an estimated cost of around €145,00050 %
15 m
The area is already equipped with electricity, gas, water, and telephone connections. The property includes an electrical substation, owned by the undersigned and managed by Enel Distribuzione. Methane gas: Possibility of connection at multiple points, as the lines run along SP ex SS 11 and SP 15. Fiber optics: Available, with a junction box located in front of the property on SP ex SS 11. Municipal sewer system: Located 20 meters west of the area. Well: Owned by the Consorzio Roggie, adjacent to the area.
Possible total or partial demolition of existing buildings. Estimated cost of approximately €165,000 for total demolition, including foundations and paved external areas, with material crushed on-site and certified for reuse as fill. Removal of trees and shrubs.
Right of access to the electrical substation. Right of way, located in a road easement area, for access to agricultural areas on the west side. Right to an aqueduct for the agricultural areas on the west side.
Sales