Skip to content. | Skip to navigation

Opportunity sold

Area Salvi Bonaventura

Via Caravaggio - 24012 - Val Brembilla (BG)
Property

Private

Total GFA

2.500 m²

Reference sector

Industriale/artigianale

Are you interested in this settlement opportunity?

Information request

Discover more about the province of Bergamo

Discover more

Details

Descrizione

Ideal for logistics, large manoeuvring spaces, building permits for remaining areas

Property

Private

Anno di costruzione

2002

Total GFA

2.500 m²

Buildable area

500 m²

Area and building dimensions

Totally industrial

Reference sector

Industriale/artigianale

Urban planning restrictions

Environmental obligation L.D. 42/04 (150 mt from rivers), and hydraulic obligation 10 mt waterway

Remediation

Not necessary

Investment opportunity

Investment type

Sales, Location

Price range for sales (€/m²)

240,00

Price range for rent (€/m²)

50,00

Competitive advantages

Accessibility to infrastructure and services
Presence of ample parking, manoeuvre areas and areas suited for stocking merchandise

Accessibility to infrastructure and services
Area adjacent to the main road axis

Competitive economic context
High concentration of businesses in the manufacturing sector in the area

Most favoured sectors

Manufacturing

Investments not permitted

Unhealthful activities in category 1

Accessibility

Exit
A4 - Dalmine

20 km

Strada Statale 470

6 km

Railway Station
Stazione Ferroviaria di Ponte San Pietro (BG)

20 km

Airport
Aeroporto Internazionale di Orio al Serio (BG)

25 km

Commitments and incentives by the Municipality

Semplification commitments

  • Guarantees that the Action Plan presented by the company is adopted by the City Council in less than 90 days from the date the request was registered.
  • Releases, upon a complete request being made, a Planning Permission in less than 60 days from the request.
  • Ensures an online 'front office' service or a dedicated section in the municipality's portal where investors or potential investors can find all useful information.
  • Uses and implements the 'electronic desk'.
  • Simplifies payments by creating a single contact for the payment of all expenses owed to the municipality and other entities.
  • Uses the SUAP [single contact point for productive activity] for proper additions to the Electronic Company File.
  • Guarantees a training course for the SUAP operators.
  • Participates in training programs related to the Electronic Company File.

Economic and fiscal incentives

  • Declares in advance all the urban planning and construction expenses, making sure not to introduce additional expenses.
  • Provides for an IMU [municipal property tax] tax rate of 8,7‰ + TASI [municipal tax on community services] tax rate of 1.1‰ (for cadastral categories D TASI tax rate of 1‰)
  • Reduces the TARI [waste disposal tax] by 30% from the current amount for activities that dispose "on their own" of their own special waste.
  • Provides a TARI exemption.
  • Provides reimbursement of IMU and TASI debits and credits.
  • Reduces the primary and secondary land development expenses, as follows: PRESENT PARAMETERS Expenses of urban. primary: €/smq 20,27 Expenses of urban. secondary: €/smq 10,19 Standard urban: €/smq 100,00 Cost of construction: €/smq 408,20 Waste treatment and disposal costs: €/smq 3,50; REDUCED PARAMETERS FOR THE AREAS SUBJECT OF THE CALL Expenses of urban. primary: €/smq 14.41 Expenses of urban. secondary: €/smq 4.97 Standard urban: €/smq 41.00 Cost of construction: €/smq 320.76 Waste treatment and disposal costs: €/smq 3.50;
  • Reduces the qualitative standard and any expenses needed to change designation of use by 21%.

Qualified assistance to the investor

  • Provides preliminary consulting services and support to companies in the presentation and implementation of their projects, with the issuance of written opinions if requested in the proposal.
  • Holds regular meetings to solve any problems with the investment process and to provide support regarding methods for payment of local taxes.
  • Enables forms of collaboration with the credit institutions in the region.

Download area


Floor plan

If you have any questions, do not hesitate to contact us

Contact us