Skip to content. | Skip to navigation

Opportunity

Area Former General Warehouses - Via Rovelli

Via Rovelli, 23 - 24125 - Bergamo (BG)
Property

Private

Total GFA

3.070 m²

Reference sector

Offices

Are you interested in this settlement opportunity?

Information request

Discover more about the province of Bergamo

Discover more

Details

Descrizione

Excellent accessibility both from the reference territory and from the highway network. Good infrastructure, both public and private, ample presence of existing and planned green areas, proximity to services, proximity to the city centre. The property complex consists of two areas located in Bergamo. The property part has excellent services and can boast a good connection to the valleys to the northeast

Property

Private

Anno di costruzione

1930 and following years

Total GFA

3.070 m²

Buildable area

16.579 m²

Area and building dimensions

See annexed surfaces

Reference sector

Offices

Urban planning restrictions

obligation for long railway compliance and obligation for roadway compliance

Remediation

Occured

In case of interest, further detailed documentation is available

Investment opportunity

Investment type

Sales

Price range for sales (€/m²)

Private negotiation

Competitive advantages

Accessibility to infrastructure and services
Near to the main infrastructure networks

Versatility and ease of development
Area of large size

Strategic location
Area adjacent to the city centre

Most favoured sectors

High-tech manufacturing and service sector, sectors of the creative industry

Investments not permitted

Managerial service sector and hotel hospitality (see excerpt of scope of transformation file annexed)

Accessibility

Exit
A4 - Milano Brescia - Bergamo (BG)

4 km

Strada Statale 671

1 km

Railway Station
Bergamo (BG)

1 km

Airport
Orio al Serio (BG) - BGY

6 km

Commitments and incentives by the Municipality

Semplification commitments

  • Guarantees that the Action Plan presented by the company is adopted by the City Council in less than 90 days from the date the request was registered.
  • Releases, upon a complete request being made, a Planning Permission in less than 60 days from the request.
  • Ensures an online 'front office' service or a dedicated section in the municipality's portal where investors or potential investors can find all useful information.
  • Uses and implements the 'electronic desk'.
  • Simplifies payments by creating a single contact for the payment of all expenses owed to the municipality and other entities.
  • Uses the SUAP [single contact point for productive activity] for proper additions to the Electronic Company File.
  • Guarantees a training course for the SUAP operators.
  • Participates in training programs related to the Electronic Company File.

Economic and fiscal incentives

  • Declares in advance all the urban planning and construction expenses, making sur not to introduce additional expenses.
  • Provides for an IMU [municipal property tax] + TASI [municipal tax on community services] tax rate of 0.76‰ in the areas identified.
  • Provides reimbursement of IMU and TASI debits and credits.
  • Reduces the primary and secondary land development expenses for the identified areas, as follows: Standard parameter of the Municipality: 40,40/€smq Improvement parameter for the identified areas: 20.20 €/sqm
  • Reduces the qualitative standard and any expenses needed to change designation of use by 50%.

Qualified assistance to the investor

  • Provides preliminary consulting services and support to companies in the presentation and implementation of their projects, with the issuance of written opinions if requested in the proposal.
  • Holds regular meetings to solve any problems with the investment process and to provide support regarding methods for payment of local taxes.

Download area


Floor plan

If you have any questions, do not hesitate to contact us

Contact us